OCR Text |
Show Preliminary Work Begun on Main St. Preliminary work began this week by Thorn Construction Co. on the resurfacing of Main street. Workmen have been busy building build-ing up the man holes along the road preparatory to laying a 3-inch 3-inch asphalt surface over the street. Traffic is being detoured' over the old highway on south main street while work is being started on that section. The resurfacing job will add much to the appearance of the main thoroughfare, the initial plans for which were begun by the Springville Chamber of Commerce. |