Show U S DRILL PLANT Big Compressor to Bo Given a Trial in Next Few Days The big air compressor by which the energy for no less than sixty drills will bo provided at the properties of the United States Mining company nt Bliigluim will be in position and ready for It work early next month said Frederick C Leon the companys engineer en-gineer yesterday Immediately this la done the machines will be given a trial and then hung up to await the reorganization of underground forces recently withdrawn and to be started on their permanent run with a signal from the smeller that l It Is ready for ore In the meantime the massive bins at the Rio Grande terminal and Into which 130000 feet of lumber has been woven have been completed and await the delivery n 1000 tons of ore dally while onehalf the towers for the tramway tram-way between the mines and the railway i rail-way arc In position with the remainder remain-der sollS up as rapidly as the contractors con-tractors and an amy of men can make it possible For the tramway Mr Leon reports a large tonnage of material arriving dally while the equipment on that division will have nil been In readiness read-iness to respond as soon as tho word comes from the management of the smelter furnaces that It is ready to start up Its |