Show the face of the long tunnel of the albion mining company at alta utah operating under the management of george wats on is no now w at a point about feet from the portal of the dwyer tunnel and still has from to 1000 feet to go to reach its objective the main object of the work is to open at depth the wellington fissure which was highly productive in the old upper workings but the tunnel is expected to cut several parallel east west veins before reaching the wellington the ground at present is comparatively dry and the work is being done in a promising limestone the war trade board anjou andol ances t t new ruling W T B R no for the imbor outstanding licenses sti chrome ore except those covering coven 11 80 ments from cuba canada and a ger abroad r revoked as to shipments from a november 11 1918 ile I hereafter le beafter no DO abro 01 of will be issued for the importation fro covering ore except licenses cuba canada and brazil |