Show BUILD CONCRETE WEIR City Creek Canyon Improvement to toBe toBe toBe Be Started at Once Work on the concrete weir well In City creek canyon anyon will be started at once and will cost the city 1760 1750 The con eon contract contract tract was let lei last night by the board of ot public works to Zerbe Walker in spite of ot the tl e price of 50 per cubic yard ard for excavating A concrete flume Hume will also be bt run under First South street at Seventh East to carry off the surface water It will be twelve inches deep and three feet wide and will be laid just under the surface of ot the street A flume was Im Impossible Impossible impossible possible owing to the other pipes and anel conduits Just under the street The flume will come out Into the gutter about fifty feet south of the th south line of the street |