Show I I. I PlANS FOR CAPITOl CAPITOlI I i PlACED ON EXHIBIT Seven Local Contractors In Intend Intend intend In- In tend to Make Bids on Big mg I State Block j I J 5 Plans Plan for Ol tho the new state capitol were ere placed on exhibit yesterday at the of- of 15 of or tho the state capitol commission lon h So tar far ar fI e n local contractors have o signified sig sl th their lr intention or f bidding on the tho work l Tho iho ho have Javi been pronounced wm tv t ll 11 C executed by the tha i representatives es ori or of i j contractors who cay a that the tho blue blueprInts jj 1 Prints prepared b by th the thi architect ct are arc arcI I much than the usual run of ot i j plans for tOI largo jobs 2 t Another r feature atun of ut the work of ot n Ji fl tl tUn architect lin las has been beci to havo u printed specifications hound bound In a n. vol- vol of oC convenient Uc dze In Instead o of themore the moro more common ol oC largo and un- un WIeld sheets I The 1 he blue prints however how how- cr c ever iro HO necessarily bulky and heavy heay A full ret Et t con consists of or five fifty I I all of or which nr arc three o and one on- half halt by b- fh v fl told tid C half t-nc-half feet fact and u upwards ls o of tort tOtY pounds pounds' when n wrapped foi Zoi DespIte the tI decision cl lon of ot the capt capil 1 i c commission to routine onlinE It Its for bids J to lo Utah a number of or outside contractors have on ln l thu ground and t t. t IJ II expected that at fifteen oV m t rt bids will be re received re re- cei from outside o the state stat zen rien are ar ulio lcd In the pUns pIanoS from coast to const coast Inasmuch uch as 15 Inn Inn- e c terIan I Ui Ii many ca CU ore are not specified I and when specified tho the f architect hll hc has It left ft ni iii crous options or 1 t furnished A a. Jars list of products from 1 b i which the mn inn choose s P At lea Iea t t. t two vo r Will ni bo oo i by the Utah capitol Ono One Is th that t of or constructing the tho Immense dome dom of o re- re re enforced and nd the oth other otherL r rIs L LIs Is Ia t that Jh th the facade will contain moO nio-e i than th nn any ther public building iJ 4 i in Jr the United State with the i of ol one of oe th the thC New Nei York state buildings s h nt t Albany Ubay Th rh Utah capitol will sh show shot two Immense e pillars from a n front liW while the toe total number for Ut th th- th building b bo fifty I Those These pillars pH- pH pil J I mrs lars will ly lIeb be of ot stone stOneS although Jone one eastern granite company compan has offered of- of to supply turned granite pHars 5 for an ev even n 1000 each 5 The The dome dom 10 of tho the Capitol which Is the first to be constructed of or r enforced re-enforced I I S concrete concrete wi 1 l measure feet from front I j the ground floor to the center of th the I ball surmounting and this ball will on bc feet above sea pea level th ground floor Ioor having hn an nn altitude of or 6 feet reet The The- announcement of tho the architect that ho he was t planning planning- a R. enforced re-enforced steel dome domo created a 1 small panic imoni structural steel manufacturers ml who have hn brought much pressure to bear orthe on or tho the commission socking to have th plans changed to provide for or steel construction con con- It was waR not so 50 much the thc j value of or this contract as It was t the es cs- cs of or a it precedent that thai In time lime might mean much to the steel Industry Tho The precedent was wae the tho winner however This dome domo will have hll a thickness of or ten Inches at the tile base baes and the walls will taper to about six nix inciteR at tt the top Concrete foundations will be laid ald for fot forthe the dome domo and It will wIH b be built up from rom roni these foundations Independent o of thereAt the trie rest reAt of the bull building eo n that It will be entirely solf IC The Tho exterior of the capitol capitol build building n will b be bA faced with wit tone and ind contractors who have haic Already already gl given I en en some attention to the plans e express pre II the opinion that It I Is unlikely ol that bids bid for tor much granite will be made within t JJ the price limit already alread fixed d. d Considerable b ble terra cotta will also be used cd In the thes exterior while SanpetE limestone will With willbe s be he used for tor th the thA Interior In th the 8 supreme su- su p promo preme court state senate nn and house ot of p representatives cs climber the g will HI be hI constructed of or ola the tho p t trade rade name namo given cIven I en to the tie Imitation marble marbe mar mar- f in fn the lobby 01 or v ble be work such stich as that tIn t b the Hotel Utah In calling for bids bid the commission I ha n the heat heat- t I t e c I 1 s P 1 b t f i In ng and contract contracts ma may be ui let iL s separately and aud the ei electric wiring willbe win will h be SL a rate contract Provision are arc m made for both and power circuits cir cir- c cults and there thero Is 19 s to be a t end arid tlc telegraph room but the tho t ions for tOT wiring t make no mention of or t conduits One paragraph of the general general specification sped sped- I f Instructions Provides that the I commission ma mav or order er such changes cs as ns may bo be deemed advisable without ate arfe ar- ar fe e the contract except that additions addi suMI- ions or deductions to the price are tue tu tube be e made on a reasonable re basis The specifications however er do not den ri the manner of lnA n at t the cost or changes changeR or provide that this change chance In Inthe th the contract contrat ct be ma made ht before or the additional work ork Is done Printed copies copieR of the specifications have hl been promised b by th printers to toda today to- to 2 da day a y |