OCR Text |
Show N.Mieii i BIOffliCOMCI, P. J. Moran was awarded the contract con-tract for paving North Washington avenue after a meeting of the stalo roads commission held at Salt Lake, Saturday. The contract calls for a six-inch six-inch concrete base with a two-incli surface of bitulithic pavement. Ths cost is to be ?15-1,051.11. The meeting was attended by Mavcr Browning- and Commissioner Flygare. The contract was let by the stale roads commission because of the fact that the new road is to be known as a state highway. oo |