| Show SPillWAY TO PREVENT FLOODS IN THE HE FUTURE Water Will Be Drained Into Weber River Serious River Serious Problem Believed Believed Believed Be Be- Solved Special to Tho The Herald Ogden Nov XO 25 A A concrete spillway has b been n constructed under the roadway at the Intersection of ot the Warren canal and Four Four- Mile Four creek which It Is believed will successfully carr carry the surplus water of or springtime Into Weber river and thus avoid the annual floo flooding Ins of the canal roadways and adjoining farms The spillway passes from the creek under under under un un- un- un der the roadway and on to the river rhoar Road Commissioner JoS Joseph ph Storey states that this has been one of or the most vexing problems in the county and that the commissioners commissioners com corn missioners are satisfied S that the spillway will wilt eliminate all difficulties In the future There are a n large number of unpaid poll taxes and the commissioner st states tes that he will begin suit against the delinquents December December De De- cember I 1 1 |