| Show Hammers To Rin RinAt Ring At Davis High Davis High School oldest school in the district has received extensive remodeling remodeling remodel remodel- ing and now presents a anew anew anew new face to students visitors visitors visitors tors and faculty The new project according to DeWayne Jay superintendent of buildings buildings buildings build build- ings and grounds for the Davis Davis Davis Da Da- vis County School District will have considerable cabinetry cabinetry cabinetry cabi cabi- work contributing substantially substantially substantially sub sub- toward the total cost of the food lab BUSSES have been housed in the Freeport Center at Clearfield during the summer months at a cost of 5 per bus As space has filled at atthe atthe atthe the center managers asked for the storing of 45 15 buses A fleet of 55 are placed in storage each summer Mr Jay said for this summer a gravel base which will be bethe bethe bethe the floor of the new storage building when erected could be used to store the buses A prefabricated building is proposed for the Davis High area IT WOULD be about 80 feet by feet and during the winter when the buses are in use could house lawn mowers maintenance trucks and assorted equipment East of the Davis High athletic field will be an eight- eight foot chain link fence with three strands of barbed wires separating the bus parking lot THE TILE FOOD preparation room remodeling would cost approximately approximately approximately ap ap- ap- ap proximately The storage storage storage stor stor- age building would be approximately approximately approximately Both re- re Davis High School is slated for a remodeling project in inthe inthe inthe the foods room of the home economics department when a chemistry laboratory willbe will willbe willbe be converted to use for cook cook- ing A bus storage building on the Davis High grounds was proposed to the Davis County school board at its regular meeting held Monday May lay 25 in Farmington |