OCR Text |
Show railroad company at a disadvantage, most of the slides of rock and debris from the pipe line and above being deposited along tho line of tho contemplated con-templated track. Tho abutments for the bridges at the month of the canyon are practically practical-ly finished, and. as soon as the river subsides sufficiently for work to bo attain started, operations will be pushed. push-ed. The balance of the work will be done under contracL HIGH WATER DELAYED I Y0RK0NCANY0H ROAD j I.'ngineer Joseph West of the t'tali J & Idaho Railroad company, now bnild-iug bnild-iug through Ogden canyon, slates that the recent warm spell with its attend- : ant flood in Ogden river necessitated the closing down of the work last ti;. Another cause was the strong wind and intense cold of the canyon with which the workmen refused to contend. The break in the pipe line of tho I'Lih Light & Railway corapnny, alao placed tho construction gang of tho |