Show MORE DOUBLE TRACK ON TUE U P GANGS OF MEN WILL BE PUT PUr TO WORK Grade on Part of the Double Road Is IsNow IsNow isNow Now Ready More West of Green River Replying to Inquiries from a Stand Standard Standard ard anI reporter regarding new work woric on oil tho the Utah Ut h division of the Union Pacific Resident Engineer Maitland said There Thore is a good deal dual of or now work contemplated between Ogden and Rawlins this year and a great deal of work that now awaits completion With the advent of better and warmer weather eathor the latter work will be taken up lip and pushed through as fast as ns pos possible pOSe possible sible and anti within a few days several hundred men mon will bo ho put oh on on laying a I second or double track between Raw Hns hins and Wamsutter This work will willbo bo he shoved shoel right along and as s the tho grade grado Is IB now ready read the tho steel and ties I on the ground the additional track should be bo read ready for lor use In a comparatively lIvey short time lime Other large forces of men also will willbo willbo willbe bo be put to work on a double track prop proposition west wast of oC Granger and the pur purpose purpose purpose pose of or the tho Union Pacific management I is to lo close up the second track gaps without more delay than Is Ie necessary I |