Show HEW CHURCH the new altar tor st josephs church which has been in the course of construction at the chop of albert A rechter on twenty third street was eat in place in the church last evening the which la aa feel long ana 16 jeet hah laoo pounds was not easy to handle and between fifty and men required to carry it trosa the truck on which ir had been conveyed to diio church and set it up in its place while it has not been completed ir will bo necessary to use the altar foi the first time on sunday as the old altar had to be removed to make room for the nevy one the side altars have not been coni dietel dieted out it wis stated that the will be finished and in place by christmas at the latest |