OCR Text |
Show 'PAVING CREW NOW.' POURING CONCRETE Tangible results in the work of Tames and Bate are now evident to the man on the street. A crew of men began pouring concrete Thursday morning and made fast progres, showing show-ing that the preparatory work has had its purpose. The steam roller has smoothed out the street in the second block and pouring will soon begin there. Thursday Thurs-day evening, the roller was working overtime in leveling the street in the center of the business district. The culverts have been built with the cement poured in the forms. To the average layman looking on, it looks as though our street work will he done by the middle of fall. The Tclluridc Power company has a small hunch of men keeping step with the paving gang in the matter of installing install-ing the ornamental lights. |