OCR Text |
Show NOTICE TO WATER USERS Notice is .i ueby given that Willard R. Williams, Kanarra-ville, Kanarra-ville, Utah, has filed a request tor extension of time from the State Engineer to make and submit sub-mit Proof of Appropriation under Application No. 15265 (73-570), covering 3 sec. ft. of underground water in Iron County, Utah, to be used for irrigation and stock-watering stock-watering purposes. It is represented that a well has been drilled under this application ap-plication and cased to a depth of 2J0 feet with 12-in. pipe at a cost of $2700, the pump and motor mo-tor installed at an additional cost of $750. Forty acres of land were prepared and irrigated at a cost of $1000, making a total expenditure ex-penditure of $4,450 to date. The water developed has a high mineral min-eral content and it will be necessary nec-essary to relocate and deepen the well to obtain satisfactory wfltpr It will enst an additional $6000 to redrill, equip the well, and develop the remaining land. ' Additional time is necessary to ! complete this project and submit i Proof of Appropriation. I Protests resisting the granting of said request with reasons therefor, must be submitted In duplicate and filed with the State Engineer, 442 State Capitol, Salt Lake City, Utah, on or before be-fore March 26, 1966. A hearing will be held on this request before the State Engineer Engi-neer at 9:00 a. m., Wednesday, April 20, 1966, at the County Courthouse, Parowan. Utah. Protestants should appear at the hearing. Hubert C. Lambert STATE ENGINEER (Published in the Iron County Record, Cedar City, Utah from Feb. 10, 17, and 24, 1966.) |