Show LOW beade ORE abe shipment of low grade oe now being loaded at gemini mine will bring the total sent out to the american smelting and company up to 10 tona which is all that the contract made a few months ago calls for 11 the proper ar rac are made with the eureka hill ang co the low grade ore will be run through the eureka hill mill bupt supt Pilger nm eaid that there every rea son to believe that the reaume from the trial which was made recently would be entirely satisfactory the gemini ore is almost identical with eureka hill ore and can be treated juat as in the mill and for this reason the two companies will most likely agree on terms |