| Show CERTAINLY MEAN REAL BUSINESS Every preparation Is being betti made for tor forthe the pushing of construction on the th Denver Northwestern and of ot the In tho tha spring cay an nn Associated Irea from Denver v nvEr today tod In a ate few days da bids will willbe be he Invited for building the road from the western end Ind of ot the tunnel to Hot Hat Springs Engineer who has hal been nt at Hot Sulphur Springs for the taut la t three days day has hal Already contracted with till the for hauling hanlin scrapers and other material from to Two This point Is III two to miles mil from the summit of at tho range Ian on the Bide I are aNI also being rapidly com completed I for tor soliciting bids bid on the tunnel Just all aft soon loon as a the th government con can duties Iuele Its It plan about up the Indian in Utah It In h probable that contracts for Cor the con of ot fhe rond roud from Calt Palt will bo m ide One of 01 the missions nf Wm Will Q 0 n In tha tho east ut at this time Is to look after the securing of ot nil the required rights of or way through that section Of the th country A formal pint I already to be tiled In ton Just as al BOOB an all the land Is II declared open tn o to settlement When till 11 time comes come for the com commencement Of or work the plans arc r to hoe have that of the line completed at atthe atthe the ame time Ume that the western rt of ot the construction Is I brought up to the mountains There will be a line across the Ille mountains mountain as It will take tak close to three yearn to complete completo the tunnel |