OCR Text |
Show UT. Sat/Sun/Mon/Tues, May 13-16, 2017 Those needing special accommodation for these hearings should contact the Town Clerk at 435-659-4739 at least three days prior to the scheduled hearings. ans with Disabilities Act, individuals needing speThe Park Record LEGALS Published in the Park Record 5/13/17. Posted 5/15/17. PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13, 2017. ORDINANCE NO. 201709 AMENDING THE LAND MANAGEMENT CODE HISTORIC RECREATION COMMERCIAL (HRC) DISTRICT, SECTION 15-2.5; HISTORIC COMMERCIAL BUSINESS (HCB) DISTRICT, SECTION 15-2.6; AND DEFINED TERMS, SECTION 15-15 PUBLIC NOTICE IS HEREBY GIVEN THAT the City Council of Park City, Utah, at its meeting held on April 27, 2017, adopted an ordinance amending the Land Management Code of Park City, Utah, amending Historic Recreation Commercial (HRC) District, Section 15-2.5; Historic Commercial Business (HCB) District, Section 15-2.6; and Defined Terms, Section 15-15. This ordinance shall take effect upon publication, and can be obtained at the City Recorderʼs Office, Marsac Municipal Building, 445 Marsac Avenue, during regular business hours. PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13, 2017. ORDINANCE NO. 201718 APPROVING THE IRON CANYON SUBDIVISION BUILDING PAD ADJUSTMENT FOR LOT 43, LOCATED AT 2467 IRON MOUNTAIN DRIVE PUBLIC NOTICE IS HEREBY GIVEN THAT the City Council of Park City, Utah, at its meeting held on April 27, 2017, adopted an ordinance approving the Iron Canyon Subdivision Building Pad Adjustment for Lot 43, located at 2467 Iron Mountain Drive, Park City, Utah. This ordinance shall take effect upon publication, and can be obtained at the City Recorderʼs Office, Marsac Municipal Building, 445 Marsac Avenue, during regular business hours. PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13, 2017. ORDINANCE NO. 201719 APPROVING THE COURCHEVEL CONDOMINIUMS AT DEER VALLEY SIXTH AMENDED, LOCATED AT 2700 DEER VALLEY DRIVE EAST PUBLIC NOTICE IS HEREBY GIVEN THAT the City Council of Park City, Utah, at its meeting held on April 27, 2017, adopted an ordinance approving the Courchevel Condominiums at Deer Valley Sixth Amended, located at 2700 Deer Valley Drive East, Park City, Utah. This ordinance shall take effect upon publication, and can be obtained at the City Recorderʼs Office, Marsac Municipal Building, 445 Marsac Avenue, during regular business hours. PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13, 2017. THE STATE OF UTAH TO PHILIP WARREN BURGESS: You are hereby summoned and required to file an answer to the complaint filed by Plaintiff CMFG LIFE INSURANCE COMPANY, in Case No. 170500034, pending in the Third District Court of Summit County, Utah. This is an action to collect sums of money which Plaintiff alleges are owed for overpayment of wages and relocation expenses. You must file a written answer with the Clerk of the Court, 6300 Justice Center Road, Suite A, Park City, Utah 84060, within twenty-one (21) days after Saturday, May 13, 2017, the last date of publication. You must also mail or deliver a copy of your answer to Clint R. Hansen and Megan J. Nelson of Fabian VanCott, 215 South State Street, Suite 1200, Salt Lake City, Utah 84111-2323. If you fail to do so, judgment by default may be taken against you for the relief demanded in the complaint. PUBLISHED IN THE PARK RECORD ON SATURDAY APRIL 29, SATURDAY MAY 6 AND SATURDAY MAY 13, 2017. JARED W. MOSS (10721) PIA ANDERSON MOSS HOYT 1526 West Ute Boulevard, Suite 206 Park City, Utah 84098 Telephone: (801) 3509000 Facsimile: (801) 3509010 jmoss@pamhlaw.com Attorney for Jami Cirone Rothstein IN THE THIRD JUDICIAL DISTRICT COURT, STATE OF UTAH SUMMIT COUNTY – SILVER SUMMIT IN THE MATTER OF THE ESTATE OF WILLIAM A. ROTHSTEIN, Deceased. NOTICE TO CREDITORS Case No. 153500075 Judge Kara Pettit NOTICE TO ALL CREDITORS: Jami Cirone Rothstein has been appointed Personal Representative of the Estate of William A. Rothstein (the “Estate”), who passed away on October 3, 2015. All Creditors are notified that all claims against the Estate are forever barred unless presented by mail or hand delivery to the Personal Representativeʼs attorney of record, Jared W. Moss, located at 1526 West Ute Boulevard, Suite 206, Park City, Utah 84098. All claims must be presented within three months after the date of the first publication of this notice in accordance with Utah law or be forever barred. DATED this April 25, 2017. PIA ANDERSON MOSS HOYT, LLC /s/ Jared W. Moss Attorney for Petitioner PUBLISHED IN THE PARK RECORD ON SATURDAY APRIL 29, SATURDAY MAY 6, AMD SATURDAY MAY 13, 2017. PUBLIC HEARING NOTICE The Preserve at Newpark Final Subdivision Plat and Final Site Plan 1153 Center Dr., Parcel NPTCR-R-2 (South of Newpark Hotel), Newpark, Summit County, UT Public notice is hereby given that the Snyderville Basin Planning Commission in accordance with the Snyderville Basin Development Code will conduct a public hearing to discuss an 8 residential unit development located at 1153 Center Dr., Parcel NPTCR-R-2 (South of Newpark Hotel), Newpark, Summit County, Utah. The public hearing will be held: Tuesday, May 23, 2017 Beginning at 4:30 p.m. Sheldon Richins Building (Summit County Library) 1885 W. Ute Blvd., Park City, Utah, 84098 The applicants are seeking a positive recommendation for the Preserve at Newpark Final Plat and Final Site Plan. The proposed Final Plat and Final Site Plan would allocate 10,150 sq. ft. of residential density from the overall Newpark density pool onto Parcel NPTCR-R-2, Newpark, Summit County, UT. For further information, please contact Amir Caus, at the Summit County Department of Community Development, P.O. Box 128, 60 North Main Street, Coalville, Utah 84017; call at (435) 336-3117; or email at acaus@summitcounty.org. To view the Staff Report available after May 19, 2017 please visit: www.summitcounty.org Pursuant to the Americans with Disabilities Act, individuals needing special accommodations during this meeting should notify the Summit County Department of Community Development at (435) 336-3157 prior to the meeting. Posted: May 12, 2017 Published: May 13, 2017 The Park Record PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13, 2017. cial accommodations during this meeting should notify the Summit County Department of Community Development at (435) 336-3157 prior to the meeting. Posted: May 12, 2017 Published: May 13, 2017 The Park Record PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13, 2017. NOTICE INVITING GENERAL CONTRACTORS TO PRE-QUALIFY TO BID PURPOSE. The Snyderville Basin Water Reclamation District (Owner of the Work) requests General Contractor Pre-qualification Proposals for construction of the Silver Creek Trunk Sewer Rehabilitation Project – Phase 1. Bids will only be accepted from those Contractors that are pre-qualified by the Owner. No other Contractors will be eligible to bid on this Project. If there be any requirements and/or criteria the General Contractor cannot meet but elects to include a Subcontractor that meets those requirements/criteria, then the Subcontractor shall provide information conforming to those requirements/criteria. Any Subcontractor included shall remain with the General Contractor throughout the bidding process. TENATIVE PROJECT SCHEDULE. The tentative project schedule is as follows: Pre-qualification documents available May 11, 2017 Pre-qualification proposals due June 1, 2017 Notification of qualified contractors June 8, 2017 Project Advertisement and Bidding June 13 to June 29, 2017 Project Construction August to November, 2017 DESCRIPTION OF WORK. The project consists of constructing approximately 500 linear feet of 27-inch sewer (121 linear feet by trenchless construction) under State Road 248, 6 manholes, 1 metering manhole structure, dewatering, sewer bypass pumping and wetland restoration, and associated work in accordance with the Contract Documents. OBTAINING CONTRACTOR PREQUALIFICATION DOCUMENT. An electronic copy of the document entitled, “General Contractor Prequalification Documents for Construction of the Snyderville Basin Water Reclamation District Silver Creek Trunk Sewer Rehabilitation Project – Phase 1” may be obtained from the Engineer at no charge by contacting Steven Meyer with Bowen, Collins & Associates at smeyer@bowencollins.co m. feet of 27-inch sewer (121 linear feet by trenchless construction) under State Road 248, 6 manholes, 1 metering manhole structure, dewatering, sewer bypass pumping and wetland restoration, and associated work in accordance with the Contract Documents. OBTAINING CONTRACTOR PREQUALIFICATION DOCUMENT. An electronic copy of the document entitled, “General Contractor Prequalification Documents for Construction of the Snyderville Basin Water Reclamation District Silver Creek Trunk Sewer Rehabilitation Project – Phase 1” may be obtained from the Engineer at no charge by contacting Steven Meyer with Bowen, Collins & Associates at smeyer@bowencollins.co m. PROJECT ADMINISTRATION. All communications relative to this Work shall be directed to the Engineer prior to submittal of the Prequalification Information: Bowen, Collins & Associates 154 East 14000 South Draper, UT 84020 (801) 495-2224 Attention: Steven Meyer, P.E. (Project Manager) SUBMITTAL PROCEDURE. The envelope enclosing the Pre-qualification Proposal shall be addressed and submitted to Snyderville Basin Water Reclamation District, 2800 Homestead Road, Park City, Utah 84098. The District will be accepting Pre-qualification Proposals until 3:00 pm M.D.S.T. on May 31, 2017. Late Pre-qualification Proposals will not be accepted. The envelope shall be plainly marked in the upper left-hand corner with the name and address of the Contractor and shall bear the words “Contractor Prequalification Documents for Construction of the Silver Creek Trunk Sewer Rehabilitation Project – Phase 1”. Two (2) complete copies of the Prequalification Proposal shall be submitted. Any documents failing to clearly present all the requested information or failing to be in the requested format may be considered non-responsive and may be rejected. OWNER'S RIGHTS RESERVED. The Owner reserves the right to reject any or all Pre-qualification Proposals, to waive any informality in the prequalification process, and to make selection and pre-qualify Contractors and to modify the schedule and scope of the Project as it may best serve the interest of the Owner. Owner: Bryan D. Atwood, P.E, District Engineer Date: May 11, 2017 PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13 AND WEDNESDAY MAY 17, 2017. quested format may be considered non-responsive and may be rejected. OWNER'S RIGHTS RESERVED. The Owner reserves the right to reject any or all Pre-qualification Proposals, to waive any informality in the prequalification process, and to make selection and pre-qualify Contractors and to modify the schedule and scope of the Project as it may best serve the interest of the Owner. C-13 For further information, please contact Amir Caus, at the Summit County Department of Community Development, P.O. Box 128, 60 North Main Street, Coalville, Utah 84017; call at (435) 336-3117; or email at acaus@summitcounty.org. To view the Staff Report available after May 19, 2017 please visit: www.summitcounty.org PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13 AND WEDNESDAY MAY 17, 2017. Pursuant to the Americans with Disabilities Act, individuals needing special accommodations during this meeting should notify the Summit County Department of Community Development at (435) 336-3157 prior to the meeting. PUBLIC HEARING NOTICE Posted: May 12, 2017 Published: May 13, 2017The Park Record Owner: Bryan D. Atwood, P.E, District Engineer Date: May 11, 2017 The Village at Silver Summit Conditional Use Permit SCBP-10-2AM (8.37 acres), 6447 N Pace Frontage Rd., Summit County, UT Public notice is hereby given that the Snyderville Basin Planning Commission will conduct a public hearing to discuss a Conditional Use Permit for a 124,432 sq. ft. (gross), 5building mixed use project proposed to be located on Lot 10 of the Silver Creek Business Park Subdivision, located at 6447 N Pace Frontage Rd., Summit County, UT. The public hearing will be held: Tuesday, May 23, 2017 Beginning at 4:30 p.m. Sheldon Richins Building (Summit County Library) 1885 W. Ute Blvd., Park City, Utah, 84098 The applicant Robert Holmes, on behalf of Fisher Creek LLC, is requesting approval for the Village at Silver Summit, a 124,432 sq. ft. (gross), 5-building mixed use project proposed to be located on Lot 10 of the Silver Creek Business Park Subdivision. The uses proposed are Residential (44,875 sq. ft. 50 units), Retail (43,849 sq. ft.), and Office (18,446 sq. ft.). The proposed uses are identified in the Chapter 2 of the Snyderville Basin Development Code as Conditional Uses. PUBLISHED IN THE PARK RECORD ON SATURDAY MAY 13, 2017. **** All legals are published on the utahlegals.com website for 30 days **** For further information, please contact Amir Caus, at the Summit County Department of Community Development, P.O. Box 128, 60 North Main Street, Coalville, Utah 84017; call at (435) 336-3117; or email at acaus@summitcounty.org. To view the Staff Report available after May 19, 2017 please visit: www.summitcounty.org Pursuant to the Americans with Disabilities Act, individuals needing special accommodations during this meeting should notify the Summit County Department of Community Development at (435) 336-3157 prior to the meeting. There are 200+ Restaurants in the Park City area... Posted: May 12, 2017 May 13, Narrow down your choices by cuisine, Published: 2017The Park Record PUBLISHED IN THE location or craving! PROJECT ADMINISPARK RECORD ON TRATION. All communications relative to this Work shall be directed to the Engineer prior to submittal of the Prequalification Information: SATURDAY MAY 13, 2017. Bowen, Collins & Associates 154 East 14000 South Draper, UT 84020 (801) 495-2224 Attention: Steven Meyer, P.E. (Project Manager) SUBMITTAL PROCEDURE. The envelope enclosing the Pre-qualification Proposal shall be addressed and submitted to Snyderville Basin Water Reclamation District, 2800 Homestead Road, Park City, Utah 84098. The District will be accepting Pre-qualification Proposals until 3:00 pm M.D.S.T. on May 31, 2017. Late Pre-qualification Proposals will not be accepted. The envelope shall be plainly marked in the upper left-hand corner with the name and address of the Contractor and shall bear the words “Contractor Prequalification Documents for Construction of the Silver Creek Trunk Sewer Rehabilitation Project – Phase 1”. Two (2) complete copies of the Prequalification Proposal shall be submitted. Any documents failing to clearly present all the requested information or failing to be in the re- check out the guide in today’s paper or Visit ParkRecord.com and click on the "Restaurants" tab |