OCR Text |
Show A 1)V F.RTISKM F.NT FOR HI 1JS Separate Sealed BIDS for the construction of the Brush Creek Water Tank and Waterline Project w ill be received by the Jensen Water Improvement District at the office of Uintah Engineering, 85 South 2IKI East, Vernal, l'tah until 3:00 pin. (Mountain Standard Time), April 19, 1983 and publicly opened and read aloud. This project, Brush Creek Water Tank and Waterline Project, consists con-sists of the construction of four schedules. Schedule A consists of the construction construc-tion of 49.000 feet of 10" PVC water transmission line from 1750 North 15oo West in L'intah County to the water tank site in Brush Creek; a pressure relief station; and miscellaneous valves, fittings, fit-tings, and bends. Schedule B consists of the construction construc-tion of a 10 MG reinforced reinforc-ed concrete water tank with accompanying site work, piping, fencing, and controls. Schedule C consists con-sists of the construction of 28.6(H) feet of 12" PVC water transmission line from the tank site down Brush Creek and its tie into in-to an existing water line at 4000 South 9500 West in Jensen; two pressure reducing stations; and miscellaneous valves, fittings, fit-tings, and bends. Schedule D consists of the construction construc-tion of 8.300 feet of 6" PVC water transmission line from the proposed 12" line down Brush Creek to its tie into an existing 3" water transmission line; two pressure reducing stations, sta-tions, and miscellaneous valves, fittings, and bends. Schedules A. C. and D are lor INSTALLATION ONLY ON-LY as the materials shall le furnished by the Owner and picked up by the Contractor Con-tractor at the owner's stockpile location. Schedule B shall be for the furnishing and installation ol all piping contols. fencing, fenc-ing, valves and other items associated with the tank construction 1 11 (U. 1 K.AL 1 1)( (CEMENTS, consisting ol Advertisment for Bids. Information for Bidders. Bid Bid Bond. Agreement. General Conditions. Supplemental Sup-plemental General Conditions. Condi-tions. Payment Bond. Per-lorman.ee Per-lorman.ee Bond. Notice of Award. Notice to Proceed. Change Order. Draw ings. Specifications and Addenda, Adden-da, may be eximined at the following locations: L'intah Engineering. 85 South 200 East. Vernal. L'tah Jensen Water Improvement Improve-ment District. Jensen. L'tah Associated General Contractors Con-tractors of American. Salt Lake City. L'tah Intermountain Contractor, Contrac-tor, Incorporated. Salt Lake City. Utah Copies of the CONTRACT CON-TRACT DOCUMENTS may be obtained at the office of-fice of Uintah Engineering located at 85 South 200 East, Vernal. L'tah, upon payment of $50.00 for each set, no part of which w ill be refunded. LEWIS VINCENT, CHAIRMAN Jensen Water Improvement Improve-ment District March 25, 1983 Published in Vernal Express Ex-press March 25. April 1, 8, and 15, 1983. |