OCR Text |
Show ADVERTISEMENT FOR BIDS Seperate Sealed BIDS for the construction of the West Jensen Water Tank and Water Line Project will be received by the Jensen Water Improvement Improve-ment District at the office of Uintah Engineering, 85 South 200 East, Vernal, Utah until 2:00 pm (MDT), May 7, 1982 and publicly opened and read aloud at the above time and place. This project consists of the construction of a half million gallon water reinforced rein-forced concrete tank, with associated sitework, permanent site piping and control systems. It also includes the furnishing fur-nishing and installing of approximately 8000 linear feet of 12" PVC pipeline and related valves, fittings, fit-tings, and appurtenances. THE CONTRACT DOCUMENTS, consisting of Advertisment for bids, . It T T-ilAAr imormauoii iui oiuucia, Bid, Bid Bond, Agreement, Agree-ment, General Conditions, Condi-tions, Supplemental General Conditions, Payment Pay-ment Bond, Performance Bond, Notice of Award, Norice to Proceed, Change Order, Drawings, Specifications and Addenda, Adden-da, may be examined at the following locations: Uintah Engineering, 85 . South 200 East, Vernal, Utah: Jensen Water Improvement Improve-ment District, Jensen, Utah: Associated General Contractors of America, Salt Lake City, Utah: Intermountain Contractor, Inc., Salt Lake City, Utah.. Copies of the CONTRACT CON-TRACT DOCUMENTS may be obtained at the office of-fice of Uintah Engineering Engineer-ing located at 85 South 200 East, Vernal, Utah, upon payment of $50.00 for each set, no part of which will be refunded. Published in the Vernal Express April 30-May 5, 1982 i |