Show G Graveling Resumed On Highway U. U S. S 40 West Vest Of Duchesne I I Graveling of the Duchesne- Duchesne Fruitland stretch of f highway 40 was resumed Thursday A double shift will vill start work on the graveling graveling grav gray eling cling next Monday it was announced announced announced an an- Thursday by Ernest W. W Crocker Manager of the N. N R. R S. S About five miles of the fifteen mile project received its gravel grave last all before the work was shut shutdown hut down because of heavy be snow Grading was resumed about a month ago and the gravel crusher crush crush- er has now been set up on the thc Vest West end of the project and was put into operation Thursday An oil surface laid with one of the new road mixing plants will vill be applied as soon Boon as the graveling is completed |