Show START 10 CONSTRUCTION f fB fee Beet e t Sheds fo for Peoples People's Sugar Company to Be 1 Erected at Once I I the beet C Construction on s sheds hods eds of ot the Peoples People's Sugar company will start iii In lit a few days announced John president of ot the tho com om pany parry One of the features of or the new sheds will be the unloading device installed in the tho runway of or the sheds Wagons loaded with beets from the fields elds will willbe willbe be run nm on to a low platform machinery will be used to pick up the wagons dumping damping them on to conclave canvass belts where the beets will be conveyed about feet to a hopper topper From the hopped other bolts belts of ot a similar character will distribute the beets to different parts of ot the tho sheds This is practically a a. new device for unloading Previous to this a pan conveyor was used in most of ot the tho modem modern mod mod- ern em rn factories of ot Utah Mr says that the sugar factories of Utah are of ot a later model than any others in the Western country country coun coun- try and that representatives from Colorado Colorado Col Col- Col orado Grado are now in Utah visiting the various va va- va various rious plants gathering information to tobe be used in the construction of contemn i n plated factories to be put up in that state Lawrence Manning has accepted the position of ot superintendent of the tho he beet sheds Mr Manning has been connected con- con with the Amalgamated Sugar company of ot Ogden for the last fourteen fourteen four four- teen reen years |