Show DRILLING PROJECT BROUGHT TO HALT HALTo o DRAPER Drapers DRAPER Drapers Draper's F FER E R A drilling project expected to increase the culinary water supply by at least one-half one second foot toot came to a standstill standstill stand stand- still Monday when workers struck a ahard ahard ahard hard rock Sufficient water has been reached at various levels however to answer purposes of ot the project W W. C. C Vaudrey city water department superintendent t. t announced The pipes will be perforated at several sev eral cral levels to let water drain into the system Pumps must be installed before before be be- fore pressure can be expected it was explained |