Show Plans Made Madelo to Open Op n Zinc Property Properly BUTTE BurrE Mont May 26 IP An W-An AAne An e early reopening of the Orphan Girl mine one of the Anac Anaconda Copper company's zinc properties was announced announced an here toda today by J. J R. R Hobbins vice president of the company compan Hobbins Hobbies said th the mine would be reconditioned and placed in operation operation operation opera opera- tion at the earliest possible date Reopening Reopening Re Re- opening of the company's zinc zinc concentrator concentrator con con- at Anaconda Mont also was announced c The Orphan Girl Girt has been kept In good state of repair since its its' operation opera tion was discontinued in June 1930 Hobbins said and it is expected to tobe be brought into full fuU production within 30 days Ore will be coming to the surface in two weeks he said but it will take longer to reach the full production figure of from to tons of high grade ore per month The operation operation operation oper oper- is expected to provide time part work for between and men Reopening of the concentrator ai at Anaconda for treatment of the Butte ore will mean work for about men on a time part basis Hobbins said He expects two or three weeks will be necessary to recondition the plant for active operation The concentrator concentrator concentrator con con- has been shut down for about the same length of time as U the Girl Orphan |