Show l I Forestry Gamp Camp Plans Discussed by Experts Plans to speed the formation of at re reforestation reforestation reforestation re- re forestation camps on state and privately privately privately owned lands in Utah so o o they will be ready for operation Immediately Immedi upon arrival in Washington were discussed at a Ii meeting with Governor Governor Gov- Gov Henry H H. Blood Fri Friday ay af after after- r- r noon The conference was was' attended S by Robert H. H lot of Ogden co- co co selector of recruits for lor forthe the camps I L. L M M. WinSor federal irrigation en engineer engineer engineer en- en William Peterson extension division director of t the Utah State Stat Ag Agricultural college C. C I L. L Forsling lead head of the forest and range nent ment station in Ogden and representatives of the state state Toad road commission n the state engineer arid and land lam board Mr Hinckley indicated v it lit was as hoped hoped to to establish at l least ast 14 lei campon camps camp campson on state and when an anif and if approval is grantee granted d. d Other phases of the reforestation tion program discussed were were the type o of at work to be of f procedure procedure dure on private lands availability t l o of at engineers and agricultural wo workers worker employed by to the inspect work and the possibility of at the state furnishing part of the equipment needed in the camps camps |