OCR Text |
Show I WILL BUILD WEIR TO MEASURE WATER City's Portion of Cost of Instrument for Equalization of Flow in Jordan. Elver Will Be S1500. The city conunissiou having authorized au-thorized the expenditure of 4 1500 lis the city's -share of the cost of a new weir in Jordan river, the presidents of the various canal companies met with tho city engineer yesterday and completed com-pleted arrangements for the construction construc-tion of tho new device. The city engineer en-gineer was instructed to proceed at oner with tho work. The now weir is to cost about $10.-000, $10.-000, and as the city owns one-sixth interest iu the watcr'to bo distributed, the city will have to jiay about ;?lo00. With the now -weir in operation it is believed a more equitable distribution of the water among the various canals can be made. |