Show I BRIDGING SNAKE RIVER Writer at American Falls Too High to BegIn Work TRIBUNE SPECIAL Boise Ida July 12State Engineer Wayne Darlington has returned from American Falls where he went to look over the site for the State bridge across Snake river He reports that tho water Is still too high to admit of preliminary work In three or four weeks Assistant State Engineer James Stephenson will begin to lake soundings with a view of selecting the best site The water In the Snake has been unusually un-usually high this season and Is somewhat some-what slow in subsiding No time will be lost in getting to work as soon as soundings can be made with safety Regarding the Wclscr bridge Mr Darlington said he understood the plans were In course of preparation and would reach him beore long |