Show THE ZINC PLANT New Machinery Practically in Place and Operations to Resume The campaign of construction at the zinc plant In Park City has been practically prac-tically completed and the active reduction reduc-tion of ore will be resumed it Is expected ex-pected early next week Interest In the plant since Its enlargement and equipment equip-ment with every modern device is not by any means confined to Park City but on the contrary xtends into a number of the camps of the State where the zincbearing ores prevail to greater or less extent That this class or ore at the Park can be profitably treated has already al-ready been demonstrated by the founders found-ers of the plant while experiments at lola Ran have taught that the zlnc bearing ores and tailings at the Horn Silver may be made a source of no inconsiderable In-considerable revenue Tlic plant at Park City will 1 resume on about eighty tons of ore dally with this to be Increase In-crease to 100 tons or more while the Intention is to ultimately Increase It to such capacity that not a pound of zinc ore need go to waste as In previous years With the zinc constituting a source of revenue It is not difficult to see how the losses now taken on silver may be correspondingly educed |