Show Grading at Tintlc ThpIn Miner says The Initial carufit graders who are to prepare the roadbed for the Oregon Short Line i amlngtou cutoff has been pitched at Uoltcr Spring half a mllo from Doro rnuJ Another outfit will make camp at the Silver City Junction and probably another at MclntyroH much The Work la to be rushed and probably 3000 men and 1000 teams will bo engaged In the work between Garlkld beach andS and-S nnd L amln lon hill Tintlc points will be connected with tho main line by stub trains and the running time of pawcnijcr trains will bo one hour and J jorty mInutes between Silver City t Junction and Salt Lako |