Show I CROSSSECTION LINE I i I Short Line Engineers Start Next Week r rt I J WORK BELOW THE GRADE T Indicates That Grading Contract Will Soon Be Lot on Part of Line to Los Angeles Below Clover Valley N I f Junction Senator Kearns of tho f Snn Pedro Road Says the Line Will Surely Bo Built and Prospect Is 0 Brighter Thnn EverAgents Meet Rnilrond Notes I I A party of engineers of the Oregon Short Line will leae for the south coyly next week to commence cross fcctionlng the surveyed line south of Clover Valley Junction As once before be-fore stated this work Is never dono until a company Is ready for grading so the Oregon Short Line will certainly cer-tainly let grading contracts for at least tho Meadow wash section in avery I a-very short time The track lu now I twentytwo miles below Uvada and when tlie grading begins at Clover Valley Junction the track will be there and as material can be hauled direct to the point t where the new grade commences track material can r be delivered right at the front and the work hurried forward |