Show THE centennial EUREKA reporter eureka utah at the centennial eureka mine operations are going along 0 as usual below the water level and at the present time the big electrically driven pumps pomps are taking care of about gallons of water per min mm ute the system of cutting this water obit out by concrete work is proving quite satisfactory although it is somewhat slow and ana next week the flow will in this manner be reduced to about gallons which is about the capacity of one unit of the pumping plant the total amount of work which has been done upon the 2000 level of the centennial eureka mine now exceeds feet but in view of the fact that this work has taken place in a cumner of different drifts it will be some little time before the points at which the ore is expected are reached the usual amount of ore is being produced at the centennial eureka mine and the underground showing is equally as good as it has been at any time in the mines history the new ore body opened from a tunnel which was tut but recently driven into the mountain just south of the shaft house is now being called upon for a portion of the mines output and from present indications this portion of the com banys ground is going to be exceptionally valuable the contour of the mountain gives the company several hundred feet of ground which is above the shaft house until recently no effort was made to prospect this ground |