Show IN RICH ORE miner mazuma alazuma nev the new boiler for the is in p ace and by the first of the week all connections will be made and everything will be in readiness to resume work in the west crosscut which was suspended recently on account of the excessive flow of water encountered when the east vein of the mazuma alazuma hills system was pierced meanwhile the men are ore in the third fourth and fifth levels the ore in the bottom level which is going to the mill is the highest grade of mill rock which the company has ever had much of the rock running as high as a ton the ore on the other levels will average about 80 on the kindergarten some ore is being on the fifth level but by far the richest and best ore is being taken out between the second and third levels in the west end of the up from the third the vein shows considerably more than a foot in width and is of high grade the which is being sunk from the third level of the kindergarten to furnish air on the bottom levels is now down ninety feet and is in good ore the coalition mine as a whole never looked better than it does today and with the facilities now had for working the property at depth the production which now taxes the mill to its capacity will be greatly increased |