Show Arce1 at Lust WASHINGTON September 25 Tile conferee on the civil appropriation bill have reached an agreement on the only remaining point of difference that relating to the new library building having adopted substantially the Senate plan They have fixed the limit at 4 000000 for the cost of the entire building build-ing the appropriation will be 500 000 for this year The work will be conducted con-ducted under the supervision of Colonel Thomas L Casey of the Engineer Corps The material already accumulated accumu-lated will be used in the structure All contracts already made by the government govern-ment will be carried out |