Show MORAN NOT INJURING PROPOSED BOULEVARD IN Sub Side Hill of Canyon ii to tn Pill PillIn In Park but hut Grade of ue Komi Hunel X Aol u t A report that P P. J. J Moran was as Cutting cut- cut ting Ling into th the tho proposed East Capitol boulevard urd in grading tho the side id Ido hill lull for 01 the new Moran loran playgrounds and park larJ In City Creek Creck canyon canon caused a hurried consultation of or commissioners with tho engineering eng department yesterday afternoon aft aft- S I After au an Iny It was wag found that the tho boulevard boule is not being Interfered Inter Inter- with The elevation of the proposed proposed proposed pro pro- posed boulevard ard Is considerably below the thc present surface or of ground above the Moran park and th the i grade of the he side hill established by the engineering engIneering- de department do- do is 45 degrees e recH This slope t takes kes the cut to the tho top of ot the side i lull Jim and brin brings bring the th t top p. p lt ede edge almost over the center of oC tl tIle e boulevard line but the boulevard rd Itself will b be on a con considerably considerably consid consid- hence the present present pres pres- ent cut only helps In making excava a tion for the tho Ul I r |