Show NOTICE OTICE I NOTICE OTICE IS S HEREBY HEREDY GIVEN BYthe BY BYthe BYtho the tho Board of ot Commissioners of ot Salt Lake CIl City Utah of ot the Intention of oC such Board ot or Commissioners to make the tho following described Improvement wit to-wit To grade curb and gutter with ce cement cement cement ce- ce ment construct drainage c system to carry water across the streets and intersections In Intersections In- In and pave with rock asphalt Sixth East Street between Third South out l lanel and anel Fifth South Streets and Fourth South Street between Fifth East and Seventh East Streets In Paving District District District Dis Dis- No 27 7 said rock asphalt roadways roadways road road- wa ways s 's to be bo sixty 60 GO feet teet between curs curbs with car tracks on Fourth South Street between Sixth l East and Seventh th East Enst Streets and two seventy-two 72 7 2 feet between cu curbs bs with car tracks on Fourth South Street between Fifth Firth East and Sixth East ast Street Streets and tw two roadways roadways roadways road road- ways twenty four tour 24 4 4 feet wide with twenty four 24 4 C foot park k between on Sixth East Street t between Third South and Fifth South streets and all of ot said rock lock asphalt roadways to have havo a a. six 6 Inch concrete base ono one and ono ono- half hal 1 1 li Inch binder and ono one and a ah h half l 11 Hi 11 inch top according to the plans and pro proof profiles tiles en file In the office of ot the Cit City Engineer and defray th the t abutters' abutters portion of ot the tho cost and e x x- x ponso penso thereof by lJ a a. local assessment upon tho the lots or pieces of ground round to bo be affected and benet benefited ted by said Improvement Im im- provement within Blocks 32 33 53 38 and J. J Pis Pia Pl B 3 13 Salt Lake Lak City abutting th the Survey frontlet fronting or upon streets street above abC named and to a 0 depth of ot twenty awn 25 S f feet ct back from said eald streets str ct Time The estimated cost does not Include the cost coat of or constructing constructing- private primate drive driveways be assessed against ways was which art aru to the property benefited In addition to tu tho the regular ular a assessment se nm t. t ch Estimated cost asseo of f each private driveway ay The total cost of oC said Improvement estimated at six forty-six thousand one no onehundred I Is hundred seventy five and 12 46 11 17 1751 l dollars All All protests protests and objections to tho tha carrying ou out t o of such intention must bo be resented presented In writing stating therein lot and block or description of p property prop prop- J erty rt to the City Recorder on or er 1 before the tho day of oC May Ia 1915 Tho Thu Board of ot Com Commissioners at Its first regular meeting thereafter to wit the 1st day of June 1915 will conK consider Iller the proposed levy and aril hear and con alder sider such uch protests and objections t if said salli Improvement as shall have been made mide m B ll By order of oC the tho Board of Commissioners Commis of ot Salt Lake CIt City Utah Dated March larch 1915 KAHL A. A SCHEID City Chaos Recorder Paving Extension No I First Publication Mn May 1916 1915 1115 Last Publication May 1915 |