OCR Text |
Show REMODELING ORPHEUM The Orpheum Theatre is now being put through a process of remodeling, which, while it results in the show-house show-house being disarranged much internally, intern-ally, has not caused the theatre to be shut down. About ten workmen are carrying out the plans of the owners and management. The front half of the floor has been removed, and a new floor will be put in at a much greater slant. The seating room will be extended ex-tended twelve feet forward and the stage will be located eighteen feet back from its present position. Manager S. C. Ruschmeier says that if present plans can be carried through, Milford will have one of the most beautiful little theatres in the 1 state. I |