Show Vernal Firms Enter Low Bids On Basin Highway Job Bids Will Be Tabulated By Commission Staff Before Contracts Canyon Road Jobs Are Included The Utah State Road Commission Tuesday acknowledged the low bid of I. A. Young Construction Co of and the Vernal Sand and Gravel of who submitted a joint for construction of the Myton-Roosevelt stretch of According to from the office of the state road commission in Salt Lake the Young bid was for and will include miles of Highway 40 A plant mix asphalt surfacing and one new concrete bridge are included in the bid Seven Enter Bids Seven firms entered bids on the Roosevelt-Myton Three other projects were considered on as many Utah road jobs at the same time the Basin job was The four bids amounted to which is less than under the engineer's estimate Colorado River bridge near Moab on U S. north miles to Seven Mile plant mix two concrete James Reed Construction Co Salt Lake Road To Buckskin Johnson Junction miles east of Kane northeast miles to road mix W. W Clyde and From point a mile east of Pana Kane eastward road mix Abbott and Waldron Co The last two projects are the first phase of a road from Kanab to the Arizona line above Glen Canyon The bids will be tabulated by the commission staff before con tracts are awarded Low bidders will be determined by checking unit the commission said The apparent low bidders are those the lowest |