Show marysvale Marys vale mine notes progress A shipment of ore has recently been made from the property ot of the iris ins IN alining lining company operating in bullion canyon marysvale Marys vale mining alining district utah according to a report from S A cotterell company official the ore was taken from tunnel number one and two and contained substantial values in gold silver lead and copper the report states the ore was shipped for the purpose of disclosing the test on milling ore and was made up of approximately 37 tons shipment was made to a salt lake valley smelter directors of the company have been considering blue prints from several milling concerns it is le ie ported and results from the above mentioned shipment is said to have convinced them that a flotation mill is necessary to more economically handle the ore which has been blocked out officials state that a substantial tonnage of milling grade ore is avail available able at the property for treatment the past few months operations have shown considerable development on the iris mining company property cross cuts and drifts from the lower levels leading of off f fi aiom orn the main or no one is as well as developments aiom the I 1 iio lo 10 one tunnel up to and above the no 2 tunnel have tended to demonstrate the amount of aliza tion in this marysvale Marys vale alca mr cotterell states that the company will endeavor to continue shipments from the companas comp anys property western mineral survey |