OCR Text |
Show NOTICE State Engineer's Office. Salt Lake City, Utah, January 14, 1928. NOTICE is hereby given tha Fountain Green City has made ap pl'cation in accordance with the requirements re-quirements of the Compiled Laws of Utah, 1917, as amended by the Session Ses-sion Laws of Utah, 1919 and 1925 to uppropriate 3 c. (. s. of water from The Big Springs in Fountain Green, Sanpete County, Utah. Said water is to be d verted at a point which bears 2937 ft. W. and 325 ft. S. from the NE cor. of Sec. 1, T. 14 S., R. 2 E., 3. L. B. & 51. and conveyed In a pipe line a distance of 3432 ft. where the water will be used during the entire yeair for generating power to be used for electric lighting and propelling machinery at Fountain Green, Utah. After having been so used the water will be returned to the natural stream at a point which bears 495 ft. E. and 325 it. S. from the NE cor. of Sec. 1, in Tp. 14 8., R. 2 E., S. L. B. & 51. Th's application is designated In the State Engineer's Office aa File No. 1022 0. All protests against the granting of said application, stating the reasons rea-sons therefor, must he by affidavit In duplicate, acc-ompained with a fee of $1.00, and filed in this office within thirty (30) days after the completion of the publication of this notle. GEO. M. BACON, State Engineer. Date of Hr.it publication, January td, 1928. Date of completion of publication, Febnuary 17, 1928. |