| OCR Text |
Show MARBLE IN THE BIG KIESEL BUILDING Slight changes In the plans for the Interior of the Kiesel block on Hudson Hud-son avenue and Twenty-fourth street have been made and marble will be used Instead of tiling In a number of' places Staircases will be trimmed with marble and other decorations whl be of that material The contract con-tract has been let to the Vermont Marble company. Manager W. A. Larklns states that by tomorrow or next day the concrete mixer at the Eccles building will Dt on the first floor of the structure an gravel will be hauled over tfie floor in carts to the machine. This will obviate the use of the street for, mixing concrete for the remaining seven floors. Immediately after tho Nye store is vacated, tho razing of the building will start and it Is expected that steel construction on the annex will begin be-gin October 1. The Commercial National Bank company 1$ building a stairway to the upper floor of the building from the front end The stairway will lead from the corridor Just Inside the outer out-er door of the bank. on- |