Show FIRM BUSY ON THREE PROJECTS Lyon Construction Co Doing Doing Important Road Jobs Three road building project including 1915 3 1 mile miles of ot hIghway are ro under construction by the Lyon Construction company with offices In the Klesel Kiesel building The Aurora road rond 1332 miles of class ono one on graveled Traveled surface highway was started In June and Is h now 75 15 per cent complete Gravel for this project I Is b being shIpped 40 miles by t train 1111 n This ro road d which Is costing Isa Is Isn isa n a federal aid project and an Im- Im Important important Im Important link of ot the th Grand Canyon highway The Tho Th Vernal Manila road which is 15 miles mile lon long Is I of ot the th forest highway cla class and Is being rapid rapidly completed This Is 18 n a United States Statu department of ot agriculture I project a connecting link between eastern Utah and WyomIng giving gl the Uintah basin access to the Union Pacific main line Building of ot the th Roose Myton-Roose velt Myton velt graveled eld surface highway 93 miles mile long lone will not ho be b com corn completed completed plated until July 1327 1927 This cons con contract con contract tract waa wa only recently awarded Tho total construction cost will willbe willbe be This federal aid project ct eliminates the th bad section on th the Victory highway and Is Important a as an east and est road EngIneers of ot the tho th way tato hl high high- highway h- h way Vay department and the th UnIted States bureau of ot public roads have h expressed sed their approval ot of progress of ot all 1111 the th work worl being handled by the th company 00 00 |