OCR Text |
Show .4 f , " - -- . if ---fpr ir;;;. - ' --y NEW COMPLEV. This is the architest's rendition of the warehouse complex that is partially constructed con-structed on North Main Street. Complex will be known at George's Place and is under the management man-agement of Paul Beck. Warehouse complex goes up in Cedar City scaping in order that the complex com-plex may meet all of the aestsetic requirements and beauty of the area. Initial phase of a warehouse complex has been completed and plans laid for future development, de-velopment, according to Paul Beck, general manager. The complex to be known as George's Place ls located at 1400 South Main Street and is operated Iby George the Music Man, Inc. Currently three buildings of the complex have Ibeen con-structed con-structed and are In use. Additional Ad-ditional structures will be erected this summer and ready for occupancy, according accord-ing to Beck. Although a general ware-housing ware-housing complex, the buildings build-ings are unique each with double doors providing ground level loading on one end of the unit and dock loading facilities on the other end for heavier truck and semi-truck loading. Buildings are fully insulated insulat-ed and after completing the complex Is expected to cost approximately $225,000. The buildings are prefabricated prefabri-cated Bulter buildings. Units have Ibeen erected by Carter Bros. Construction Company of Cedar City. They will also install in-stall additional units planned for this summer Beck indicat. ed. Three of the proposed five sections of the complex are currently In use. Plans also call for land- |