OCR Text |
Show Bids will be received until the hour of 10:00 AM on Tuesday, February 19, 1991, at which time they will be opened and read aloud in the Planning Conference Room, 790 S. 100 E., Bountiful, Utah. Each bid must be submitted on the form provided as a part of the contract documents and shall be accompanied by a certified check, cashier's check, or bid bond from a surety company, acceptable to the amount equal to at least five percent (5) of the bid. Said check or bid bond shall be given as a guarantee that the bidder will execute ex-ecute the contract in conformity with the form of contract included in the contract documents, and furnish a performance bond within fifteen (15) days after notification of the award of the contract to the successful bidder. Bountiful reserves the right to reject re-ject any or all bids, or any part of any bid or to waive any informality in any bid as its best interests may appear. A decision on the rejection of any or all bids or the award of a contract will be made within seven (7) days after the bids are opened. Due to the nature of existing conditions, condi-tions, it is imperative that each bidder thoroughly familiarize himself with said conditions. It is strongly recommended recom-mended that personal contact be made with Don Mecham, Bountiful Cemetery Sexton, 2020 So. 200 W., Bountiful, Utah, 298-6172. Published in the Davis County Clipper First publication Feb. 5, 1991 Last pubUcation Feb. 12, 1991 Issue No. 67 C-844 NOTICE TO CONTRACTORS 1- Sealed proposals will be received at the office of the City Planning Dept., Bountiful City Hall, 790 So. 100 E., Bountiful, Utah for the following sprinkler system renovation: Bountiful City Cemetery, 2020 S. 200 W. Proposals will be in accordance with drawings and specifications prepared by the City Parks Dept. which may be obtained from the Planning Dept. at 790 S. 100 E., Bountiful, Utah upon payment of thirty thir-ty dollars ($30.00) per set. Deposit will be refunded upon return of such drawings and specifications in good condition within ten (10) days after the date set for the bid opening. |