OCR Text |
Show LOGAN AND SMITHFIELD CANAL. The canal is now fairly in course of construction, about 50 men being employed at the present time, and those who have taken jobs on it are requested to commence work immediately. The city lots of east Logan survey, which are to be watered by the canal, are being given out, in payment for work on the canal, and it is the design to have the water flowing in the canal by April next, and to accomplish this it is very necessary that all concerned in the work should help push it vigorously. |