Show FRESH AIR FOR FORU FORU FORu U U LABORATORY A new system of or ventilation is being being being be be- be- be ing installed In the chemical laboratory at the University of Utah Previously there thre has been no adequate means of drawing off the fumes incident to the chemical tests and experiments conducted conducted conducted con con- ducted there Other improvements are being made in the various buildings under the di direction direction dl- dl of Master Mechanic Charles E. E Forsberg such as repainting and tint tint- ing The Tho offices of the faculty of the English department are undergoing rearrangement and renovation and all of the rooms are being thoroughly cleaned in preparation for the opening of the new school year yar early in Sep Sep- Sep Sep-I |