OCR Text |
Show MOTOR SERTICE ON CACHE VALLEY LINE The people on ths Caebe rslley branch of tha Oregon Short Lin sre happy because they have a better train service. Commencing yesterday, ens of the new 100-passenger motor ears recently re-cently purchased by ths road was put in operation between Cache Junction and Preston. The, ear makes connections connec-tions with all through trains at Cache Junction and makes. ths rnn to Pres- toa one n day and to Logan twice a day. Xo change has been made in the schedule from that ef th steam train formerly operated. Th motor ear makes no change in the Cache vaJley speeial, whieh will continue to leave this eity at 4:15 p. m. and run through to Preston, returning to Salt Lake City at 11:35 a. m. The motor ear whiek waa sot on to make the ran between McCammon asd Montpelier. Ida-, haa been withdrawn for the present. The car waa put en only as an experiment, and it was found that it could not make the time over the heavy grade, the ear being a high gear with apecia referenc to speed. By August 1 tore mor new motor ears will ksvs been received by the company. Ons of thee, ia n low gear car and waa built with speeial reference to the work that had to be done between McCammon nnd Montpelier. Montpe-lier. Aa soon aa thia car arrive it will be put in serviee on that part of ths system. |