| Show BOULDER DAM STORAGE TO START NEXT WINTER BOULDER CITY Nev April 25 I Storage ot of water from the river in the great basin back of Bout Bout- BouttIer tIer del dam will begin next wInter I ably next February John C C. Page office engineer on the project said today Water will be let out of the intake tower gates to the upper upper penstock tunnels and outlet systems before the spring floods arrive The generation of eleCtricity will wUl willbe be started the first of September 1935 1035 Only part of units will be put into operation at that time but the remaInder will be started started start start- ed soon thereafter r |