| Show South S S. S SL S A L. L Gels Gets Water Wafer Pipe SOUTH SALT LAKE LAIE Sept 3 3 Two carloads of the tho inch Id-inch pipe for th the construction of the thc main mam feeder line in the South Salt Lake municipal water system have been received from Birmingham Ala it was reported report d Friday by William T T. South city manager The pipe was too large for the plant in Ironton to mako make so we had to order it from Alabama am and when another shipment of pipe anc and fittings have been received rapid progress in the completion of the underground system is expected Mr South said This line Une will run from the overhead overhead overhead over over- head tank which will be located at 2527 S S. S West Vest Temple to State street along Oakland avenue 1 |