OCR Text |
Show KING- CON. TO RESUME. New" Pump Ready to Master "Waters That Have Been Bothering. Operations in the Silver Jting Consolidated Consoli-dated shaft will resume tomorrow, aflor a suspension covoring a period of about a month for repairs and tho Installation nf a station pump on the 700-foot level, says a message from Park City. Tho new pump has a capacity of 500 gallons gal-lons por minutes and is amply capable of handling tho Inflow of water at the property, prop-erty, which is coming in at the rate of 250 gallons per minute. With tho pump at tho COO station and tho ono Just lnstallod at tho 700 tho problem of draining the shaft Is oslved for somo time. By lowering theso at suitable times tho 1200-foot level will be reached without tho addition of any more machinery. During tho suspension of sinking operations opera-tions tho boilers have been placed in a condition of thorough repair and everything every-thing is In tip-top shape for a run for four to tho shift will go on tmmcdialelyi |