Show 7 GRADING HAS BEGUN 2uany Hen Now at Work on the Leamington CutOff VicePresident and General Manager Hv II Wattls of the Utah Construction Construc-tion company Is at the Kenyon and goes out to Tlntlc today to start another an-other party which left Ogden last I night for Dorcmus station at which point grading will be also pushed on the Leamington cutoff Mr Wattla has Just returned from a trip over the entire route and In conversation last night he said that the work at the tunnel was to have commenced yesterday yes-terday and by today It will be In full I blast The first work will be the big cut at the two approaches to the tunnel tun-nel and by tho time this work Is completed com-pleted the real work on the tunnel will be commenced Men arc now being sent to all parts of the line and In a few days the work will under way allover over the line and will be pushed with vigor The work has been sublet to some parties who will grade north from Leamington Men arC now at work there and today there will bo men at Tintlc the tunnel and at Buena Vista and In l few days another party par-ty will be put to work at Garllcld where there Is some reavy rock wOk Mr Watts says that the survey Is one 4 i of the IfkSL lie has ever secrifor a similar i sim-ilar piece of work and It would hardly be believed that n lIne could be secured se-cured In that country with a maximum maxi-mum curvature of 4 degrees and a maximum grade of 8 per cent Somo more heavy work will be encountered In crossing Boulder summit hut the work will not call for any extraordinary extraordi-nary features The steam shovels and other material mate-rial will all be hero In a short time and sailing from then on all will be clear |