Show BIG FLUME REBUILT BAPID WORK BY BEAR RIVER WATER COMPANY Forty Men and Ten Teams Engage I in tho Worb Canal Now Has Pull Head of Water On I Pavhl Evans of Salt Lake and Mo slah Evans and George Austin of the Lehl Sugar factory all of whom arc interested In the Bear River Canal I company returned homo yesterday from the scene of the recent break In the big flume two miles above the head of the qanal When the break occurred a week ago diverting the water from the canal and threatening serious loss to the watertakers It Was predicted that it would take six weeks to repair it In six days however from the time the canyon landslide occurred and caused the break the big flume sixty seven feet In length eighteen feet wide and threo feet high had been rebuilt and a full head of water was coursing through the canal with the oldtime vigor 1 Forty men and ten learns were engaged In the repair work and 10000 feet of lumber was used I |