Show CANANEA TO RESUME guardian safford ariz two furnaces of the greene cananea cananda consolidated copper company at cananea cananda Ca mexico started operations yesterday morning the long looked for resumption sent a thrill of joy through the people of cananea cananda and was received with evident satisfaction is by everyone in this section of the southwest C F shelby and the operating staff of the company witnessed the first charge blowing in two of the eight furnaces dr L D ricketts was not present being absent in the east on company business resumption at two other furnaces is expected within a few weeks it is known that controlling interests in the company are anxious to get the plant at cananea cananda in full operation as soon as conditions will warrant this resumption however will be gradual if four of the furnaces are in operation within a month or six weeks everyone will lie be satisfied in fact they are at present now that actual ope operations operatic ratio n s have been commenced the improvements made at cananea cananda will enable the company to produce copper at considerably lower cost than they did before the shutdown shut down they will also now have the benefit of lower cost in considerable of the raw material necessary in the production of copper while nothing has ever been officially given out it has been generally reported that the mexican government recently made certain concessions in the matter of duties on material which it was necessary to import into mexico from the united states |